The Network Fusion data files are regenerated upon each release of the Network Rail Track Model at 110 yard (approximately 100 metre) intervals for all ELRs.

Examples are shown below for three ELRs: West Coast Main Line (CGJ7), Newquay Branch (NEW), and Atlantic / South London Line (ATL). Download a subset of the data for ELR REB2 in CSV form.